Flager Hospital Emergency Electrical Plant Upgrades

This Emergency Electrical Plant (EEP) project is the first of Flagler’s hospitals to be constructed and delivered utilizing the Design-Assist, CM at-Risk delivery method. All previous construction projects were delivered using the traditional design-bid-build process. This project consisted of renovating and converting an existing 1-story building into a 2-story electrical plant. The space houses three […]
Butler 95 Logistics Center at Cypress Plaza Industrial Park

Butler 95 Logistics Center is an institutional quality rear load warehouse that consists of 183,019 SF 32′ clear height, dock-high tilt-wall construction on a 13-acre site strategically located off US 1/Phillips Hwy in the Cypress Plaza Industrial Park. Dock-high doors, intermediary ramps, and spec offices are all delivered with the shell for fast tenant occupancy […]
Ascension St. Vincent’s Medical Office Building

This project was a three-story medical office building built to accommodate many medical specialties. The scope of work encompassed construction of the 82,000 SF core & shell, site improvements, and tenant build-out of 24,000 SF of the building. The initial fit-out completed by DBK housed Neurology, OB/GYN, Pulmonary, Cardiology Testing, Urology, and a timeshare space […]
Vystar Credit Union Regional Hub

The VyStar Credit Union Regional Hub, Tallahassee (VyStar Tallahassee), the 68th full-service location of VyStar Credit Union, was established not only to better serve the Florida Panhandle community but also introduced a regional Contact Center, generating more than 25 employment opportunities. As an added benefit, a Starbucks Coffee® is on the 1st floor, enhancing the […]
Transflo Westborough, Massachusetts Terminal Expansion

The project consisted of completing the development of the terminal to increase the capacity for transloading products from trucks to railcars. DBK was contracted to develop the site’s last 5 acres.