Tote Maritime Terminal Improvements
The project included the installation of inbound and outbound pedestal foundations, internal trouble kiosk setup, administration building pad construction, SIU gate control building pad establishment, administration building, parking area, container processing area, installation of ten (10) reefer racks, creation of a reefer service area with its building, laying a concrete pad for a damaged container […]
Riverside Endoscopy
The scope of work consisted of renovating a one-story facility and a small addition, along with related site work. The work included landscaping, irrigation, fencing, concrete foundations, concrete slabs on grade, unit masonry, termite treatment, pre-engineered roof trusses, roofing, asphalt shingle roofing, modified bitumen, insulation, fireproofing, doors, windows, hardware, drywall, architectural woodwork, cabinets, lay-in ceilings, […]
Pattillo Imeson Road Building 3
Building 3 is a 297,451 SF tilt-wall warehouse featuring thoughtfully designed office space, remote restrooms, (31) dock levelers, and impressive (83) cross-dock overhead doors. Site development included essential work such as paving, drainage installation, and utility setup. This project is the second constructed by DBK on this site. A key feature of Building 3 is […]
Pattillo Imeson Road Building 2
DBK’s scope included performing the work for the site’s development, including site preparation, paving, drainage, and utility installations. The overall project involved the construction of two distinct warehouse structures, Buildings 2 and 3. Building 2 is a 178,000-SF tilt-wall warehouse with an office build-out, (27) dock levelers, and (49) overhead doors. The complex is situated […]
Memorial Hospital Labor & Delivery Renovations
This project included the complete interior renovation of six (6) Labor & Delivery Suites for Memorial Hospital. Each room included premium architectural finishes such as wood-paneled ceilings, stone countertops, automated TV lifts, and special lighting.
Flightstar Hanger 815 Expansion & Tenant Improvements
The project expanded a structural steel hangar by 100,000 SF, accommodating up to six (6) B727 aircraft. The newly installed hangar doors, standing at a height of 60 feet, were designed to house one (1) Boeing 767 and (2) two Boeing 747 aircraft. Additionally, the construction included erecting a two-story office building and associated shops, […]
Amtrak Progressive Maintenance Facility
This facility stretches approximately 50 feet wide and extends 920 feet in length, featuring a 600-foot-long in-ground pit. With a strong focus on environmental sustainability, this facility incorporates several elements in line with the Leadership in Energy and Environmental Design (LEED) standards for construction. The project includes various amenities such as an emergency generator capable […]
Amports Automotive Processing Facility
This project entailed constructing an auto processing facility featuring a one-story, 14,950 SF pre-engineered metal building on an existing concrete and asphalt pavement site. The facility comprises a processing area with a foil room with multiple lifts, three (3) offices, a conference room, a break room, restrooms, and necessary mechanical, electrical, and IT spaces. The […]