Southeast Toyota Vehicle Processing Facility

Project Details:

The project encompassed site work and the construction of eleven (11) buildings, serving purposes such as processing, accessorizing, car wash, technical training, and truck and maintenance operations within this facility. The rail facility boasted virtually unlimited capacity for processing vehicles. This state-of-the-art Vehicle Processing Facility required thorough planning and pre-construction services before construction commenced to ensure the facility was designed and constructed efficiently and economically. Construction involved using long-span structural steel trusses, tilt-up concrete, composite structural steel, and shallow foundations. Meeting the project’s demands required the simultaneous completion of all buildings and the installation of various types of equipment essential for vehicle processing and distribution.